InterMoor completes Chain Tensioning, Cutting on FPSO in GoM

June 8, 2016

InterMoor, an Acteon company, has successfully completed the final tensioning and chain cutting operations on the FPSO Turritella for the Shell Stones project, located in the Walker Ridge protraction area in the Gulf of Mexico (GoM).
 
The FPSO Turritella will connect to subsea infrastructure located beneath approximately 9500 ft (2896 m) of water, breaking the existing water depth record for an oil and gas production facility. This ultra-deep water project marks the first FPSO for Shell in the GoM, and the second FPSO in the GoM.

Having arrived in January 2016, the Turritella is a dis-connectable turret moored FPSO with nine mooring lines consisting of chain and polyester, arrayed in three bundles of three. The mooring lines were attached to a dis-connectable Buoyant Turret Mooring (BTM) buoy in field, awaiting the FPSO’s arrival. Each mooring leg has an in-line mooring connector (ILMC) tensioning system, located approximately 900 ft below the surface, which was pre-tensioned after connection to the BTM. Once the Turritella arrived, and the BTM was recovered by the FPSO. InterMoor’s work scope consisted of chain final tension adjustments through the ILMC system, subsequent cut and removal of excess chain, and riser pull-in rope stretching and transfer to the FPSO.
 
InterMoor used the Seacor Keith Cowan anchor-handling vessel (AHV) to perform the first phase of the operations and later moved to a larger construction vessel already on charter and on standby.
 
Tom Fulton, global president, InterMoor, said, “InterMoor supported this FPSO’s mooring needs by utilizing a cost-effective and Jones Act compliant anchor handling vessel, whereas competitors would typically resort to a large construction vessel.
 
“We were able to successfully provide full project management and engineering, including: design, procedures, procurement, dock support, offshore equipment and personnel for all phases. Our team also designed installation aids and fabricated them in our Morgan City facility, in Louisiana.”
 
Acteon sister companies worked alongside InterMoor on the project, with UTEC providing the positioning survey for the AHV, and Mirage custom-designing and fabricating the diamond wire cutting saw and clamping system.
 
InterMoor also provided the following services for the Turritella installation:
·       Provision of Tow Masters on-board the FPSO. 
·       BTM buoy clump weight rigging removal.
·       Dock and equipment support to Shell contracted heading control tugs.
·       FPSO heading control steering lines design, procurement and offshore installation
·       Dive-Support Vessel mooring design, procurement and offshore support for hook-up and disconnection.

Logistics News

DP World Begins $165 Million Expansion of Maputo Container Terminal Capacity

DP World Begins $165 Million Expansion of Maputo Container Terminal Capacity

Port Canaveral Invests $500 Million in Five-Year Port-Wide Improvement Plan

Port Canaveral Invests $500 Million in Five-Year Port-Wide Improvement Plan

Syria Signs New 30-Year Deal with CMA CGM

Syria Signs New 30-Year Deal with CMA CGM

Adani Ports Sees Higher FY26 Revenue Growth on Robust Volumes

Adani Ports Sees Higher FY26 Revenue Growth on Robust Volumes

Subscribe for Maritime Logistics Professional E‑News

Refining Margin for 380-cst HSF O reaches more than 6-year High
Syria signs 30-year agreement with French shipping giant CMA CGM
Data and sources say that the last Chevron chartered vessel is returning oil cargo to Venezuela.