USCG Cutter Biscayne Bay Hauled Out

By Michelle Howard
Monday, May 19, 2014

Great Lakes Shipyard hauled out the United States Coast Guard Cutter Biscayne Bay  using its 770-ton capacity Travelift.

The repair contract that started on May 7, 2014, includes drydocking and routine maintenance such as:

  • Hull Plating and Ultrasonic Testing
  • Appendages and Leak Test
  • Shaft Seal Assembly and Overhaul
  • Rudder Assembly, Remove, Inspect and Reinstall
  • Anchor Windlass, Level 2 Inspect and Repair
  • Vertical Capstan, Level 2 Inspect and Repair
  • Propulsion Shafting, Remove, Inspect, and Reinstall
  • And Other Various Cleaning, Inspections, and Repairs

This is the second of the USCG’s six (6) Great Lakes stationed 140-foot Bay Class ice breaking tugs to be drydocked using Great Lakes Shipyard’s new Marine Travelift. The Shipyard’s Travelift has also been used to lift one of the 150-foot Buoy Barges pushed by the Bay Class Tugs, and the USCGC Buckthorn, stationed in Sault Ste. Marie, Michigan. The Travelift is the largest on the Great Lakes in the United States and Canada, second largest in the Western Hemisphere, and third largest in the world. It was specifically designed and sized for Great Lakes Shipyard to accommodate the Bay Class Coast Guard Cutters and other vessels.

Work on the Biscayne Bay  is to be completed by late July.

 

Categories: Ship Repair & Conversion Coast Guard Vessels

Related Stories

Ocean Aero to Continuously Monitor the Port of Gulfport Autonomously

Tech, Digitalization Reshape Traditional Maritime Jobs

Fincantieri, Accenture Launch JV for Cruise, Defense and Ports Digitalization

Current News

Seafarers Stranded Off Yemen After US-Houthi Ceasefire Deal

Maersk Warns Global Container Volumes Could Drop Due to Trade War

Near-Record US Container Imports in April Expected to Snap in May Due to Tariffs

New IMO Designation for the Mediterranean Sea Helps Bring More Doba Crude to Europe

Subscribe for Maritime Logistics Professional E‑News