Teekay’s 1st Arctic LNG Carrier Completes Trial

By Aiswarya Lakshmi
Sunday, November 12, 2017

Teekay LNG Partners said its first icebreaker liquefied natural gas (LNG) carrier newbuild, Eduard Toll, recently completed gas trials. 

Eduard Toll is Teekay’s first of six 172,000 cubic meter ARC7 LNG carrier newbuildings to be constructed for the Yamal LNG project. 
The ARC 7 LNG carrier was launched in January this year at the South Korean Daewoo Shipbuilding & Marine Engineering (DSME) shipyard.
The vessel has been designed and built to perform year-round navigation through the Arctic and has the icebreaking ability allowing it to proceed through ice up to 2.1 m thick.
Yamal is expected to produce 16.5 million metric tons of LNG annually by 2019, which will require a total of 15 ARC7 icebreaker LNG carriers.
Categories: Arctic Operations LNG Vessels

Related Stories

Golden Pass LNG Ships First Export Cargo from Texas Terminal

Golden Pass LNG Ships First Export Cargo from Texas Terminal

First LNG Export Cargo Departs Sabine Pass Terminal

Exmar Launches FSRU Conversion Work for Dutch LNG Terminal

Current News

Tuapse Port Fire Extinguished Days After Ukrainian Drone Attack

Port of Antwerp-Bruges Reports Weak Start to the Year

Hydrogen Fuel Cell Harbor Craft Pilot Study Launched in Singapore

BIMCO Warns of Hormuz Toll Scam

Subscribe for Maritime Logistics Professional E‑News