Mississippi River Temporarily Shut for Dredging Work

Tuesday, September 14, 2021

The Mississippi River, the second longest U.S. waterway, was temporarily shut to vessel traffic on Tuesday from mile 0 to mile 2 due to dredging operations, the New Orleans Board of Trade (NOBOT) said.

The closure, expected to be lifted on Tuesday afternoon, it scheduled to be repeated on Sunday to finish the removal of dredging pipeline. Vessel traffic at the Mississippi has been interrupted several times since late August due to damages caused by Hurricane Ida.


(Reporting by Marianna Parraga)

Categories: Ports Dredging Coastal/Inland

Related Stories

CO2 Logistics Hub Under Development at Stockholm Norvik Port

Liebherr to Supply STS Cranes to Port Tampa Bay

Stena Line and ABP Start Work on Immingham Terminal

Current News

Port of Oakland Moves 174,239 TEUs in November as Exports Increase

CMA CGM Vessels Navigate the Suez Canal, Hinting at Easing Tensions

Oil Loading in Venezuela Crawls After New US Interceptions

FMC Investigates Spain’s Restrictive Port Practices

Subscribe for Maritime Logistics Professional E‑News