Mississippi River Temporarily Shut for Dredging Work

Tuesday, September 14, 2021

The Mississippi River, the second longest U.S. waterway, was temporarily shut to vessel traffic on Tuesday from mile 0 to mile 2 due to dredging operations, the New Orleans Board of Trade (NOBOT) said.

The closure, expected to be lifted on Tuesday afternoon, it scheduled to be repeated on Sunday to finish the removal of dredging pipeline. Vessel traffic at the Mississippi has been interrupted several times since late August due to damages caused by Hurricane Ida.


(Reporting by Marianna Parraga)

Categories: Ports Dredging Coastal/Inland

Related Stories

Port of Los Angeles Handles Over 1 Million TEUs in October

Smart Port Challenge Draws Record 586 Proposals, Names 2026 Winners

U.S. Container Imports Hit Record High as China Trade Surges, Port Delays Mount

Current News

Port of Los Angeles Handles Over 1 Million TEUs in October

Houthis Attack Saudi Oil Pipeline Pumping Station

EU Wheat Drops as Focus Shifts to Ukrainian War, Argentinian Exports

White House to Extend Jones Act Shipping Waiver

Subscribe for Maritime Logistics Professional E‑News