Konecranes Wins $46 mln USN Crane Deal

Posted by Michelle Howard
Wednesday, December 18, 2019

US Navy has contracted Konecranes to deliver a 175-ton portal jib crane to the Puget Sound Naval Shipyard in the State of Washington. 

The $46-million order was booked in December and contains options for six additional portal jib cranes over the next seven years. If realized, the total value of the agreement would be around $330 million.

The crane to be provided is a Konecranes tailor-made design, unique with features that allow it to operate on the multiple rail section sizes, straight or curved, located at the Naval base. The portal jib crane is also designed to minimize wheel loads while operating at maximum capacity through the maximum operating range with Konecranes’ unique dynamic stability system.

This design of crane is tailored to the historical shipyard layouts of the US Navy, but could be used globally in other Naval shipyards with similar configurations.



Categories: People & Company News Contracts Shipbuilding Ports Marine Equipment US Navy

Related Stories

TotalEnergies, OQEP Start Construction of Marsa LNG Plant in Oman

USTR Implements Port Fee Proposal

Trump to Push Allies to Conform to Chinese Vessel Fee Plans

Current News

DP World Begins $165 Million Expansion of Maputo Container Terminal Capacity

Port Canaveral Invests $500 Million in Five-Year Port-Wide Improvement Plan

Syria Signs New 30-Year Deal with CMA CGM

Adani Ports Sees Higher FY26 Revenue Growth on Robust Volumes

Subscribe for Maritime Logistics Professional E‑News