Indian Port Extends Container Handling Capability

The Hindu
Sunday, February 24, 2013

A second container terminal at V.O. Chidambaranar Port at Tuticorin, Tamil Nadu, India to be ready by year-end.

The second container terminal will have a handling capacity of six hundred thousand TEUs (20-foot equivalent units) to cater to the needs of export/import traders, reports The Hindu.

The need has arisen as the container handling capacity of the existing terminal has reached a saturation point. The terminal will commence interim operations by deploying gantry cranes within two months and its full-fledged operations will commence from the beginning of 2014. The capacity of the port will increase to one million TEUs.

The new terminal will have a draft of 12.8 m and the estimated project cost is Rs 312.23 crore (a crore is equal to 10-million).

Source: The Hindu

Categories: Container Ships Logistics People & Company News Ports

Related Stories

Port of Sunderland Selects PicoMB Multibeam Technology for Port Surveys

UK's Port of Tyne Unveils $200M Upgrade Plan to Back Offshore Wind

St. Bernard Port Releases Annual Report for 2025

Current News

Major Colombian Container Terminal Orders 25 Konecranes RTGs and 10 Retrofits

Stena Line welcomes Stena Futura onto Belfast-Heysham route

South Korea's HD Hyundai Heavy Eyes Acquisition of US Shipyard

ASEAN Looks to Deepen Trade Ties with China

Subscribe for Maritime Logistics Professional E‑News