Great Lakes St. Lawrence Seaway System Issues Notice to Shipping

Thursday, January 2, 2025

The Great Lakes St. Lawrence Seaway System as amended a Planned Outage at Lock 7.

Mariners are advised of a revision to the preplanned closure at Lock 7 for the replacement of Gates 1 and 2. Due to environmental conditions, the closure will begin one day later. The details are as follows:

  • Dates: January 6, 7, 8 and 9, 2025
  • Time: 08:00 to 18:00 each day (10-hour window)
  • During these periods, the lock will be unavailable for transit.

Any deviation from the above schedule will be communicated via major delay communication.

Categories: Ports Government Update Great Lakes Coastal/Inland Regulation Infrastructure Marine Safety

Related Stories

Ground Breaks on New Delaware Container Terminal

Contecon Manzanillo Ready for Ultra Large Container Ships

Brazil Port Terminals Call for Dredging Amidst El Niño Threat

Current News

Russian Seaborne Oil Exports Rise 16.4% in August

Iran Reroutes Russian Wheat Imports Through Caspian Sea

Strait of Hormuz Vessel Traffic Slows to a Trickle

Panama Canal Stress: Is the Worst Dead Ahead?

Subscribe for Maritime Logistics Professional E‑News