Great Lakes St. Lawrence Seaway System Issues Notice to Shipping

Thursday, January 2, 2025

The Great Lakes St. Lawrence Seaway System as amended a Planned Outage at Lock 7.

Mariners are advised of a revision to the preplanned closure at Lock 7 for the replacement of Gates 1 and 2. Due to environmental conditions, the closure will begin one day later. The details are as follows:

  • Dates: January 6, 7, 8 and 9, 2025
  • Time: 08:00 to 18:00 each day (10-hour window)
  • During these periods, the lock will be unavailable for transit.

Any deviation from the above schedule will be communicated via major delay communication.

Categories: Ports Government Update Great Lakes Coastal/Inland Regulation Infrastructure Marine Safety

Related Stories

IMPA Makes the Case Against Competition in Maritime Pilotage

America’s Ports, Harbors, and Waterways: Dredging, Resolve and the Will to Build

Fujairah Bunker Prices Surge as Demand Shifts Elsewhere

Current News

US Crude Being Shipped to Asia Via Panama Canal

PERC Leads Fuel Conversation at Port of the Future Conference

Exxon, BP, Vitol Ship Record Volume of US Oil Products to Australia in March

GT Wings Establishes Manufacturing Partnership with Zunsion Technology for AirWing Production

Subscribe for Maritime Logistics Professional E‑News