Great Lakes St. Lawrence Seaway System Issues Notice to Shipping

Thursday, January 2, 2025

The Great Lakes St. Lawrence Seaway System as amended a Planned Outage at Lock 7.

Mariners are advised of a revision to the preplanned closure at Lock 7 for the replacement of Gates 1 and 2. Due to environmental conditions, the closure will begin one day later. The details are as follows:

  • Dates: January 6, 7, 8 and 9, 2025
  • Time: 08:00 to 18:00 each day (10-hour window)
  • During these periods, the lock will be unavailable for transit.

Any deviation from the above schedule will be communicated via major delay communication.

Categories: Ports Government Update Great Lakes Coastal/Inland Regulation Infrastructure Marine Safety

Related Stories

Bombs Fly, Oil Soars: Trump Urges Iran to Make a Deal

BAE Systems Set to Open $250M Shiplift Facility in Florida

Aptamus Picks Aker Solutions’ Entr for LCO2 Terminal Engineering

Current News

Unresolved Issues Plague Vietnam-US Trade Talks

Protesters Call for Halt to Live Calf Exports

New Crane Tips Over During Delivery at Tuas Port

Imports drop 9% at Los Angeles Port in May Under 145% Tariffs on China

Subscribe for Maritime Logistics Professional E‑News