Great Lakes St. Lawrence Seaway System Issues Notice to Shipping

Thursday, January 2, 2025

The Great Lakes St. Lawrence Seaway System as amended a Planned Outage at Lock 7.

Mariners are advised of a revision to the preplanned closure at Lock 7 for the replacement of Gates 1 and 2. Due to environmental conditions, the closure will begin one day later. The details are as follows:

  • Dates: January 6, 7, 8 and 9, 2025
  • Time: 08:00 to 18:00 each day (10-hour window)
  • During these periods, the lock will be unavailable for transit.

Any deviation from the above schedule will be communicated via major delay communication.

Categories: Ports Government Update Great Lakes Coastal/Inland Regulation Infrastructure Marine Safety

Related Stories

Sentinel Midstream to Begin Building Texas Deepwater Oil Export Port

U.S. Appeals Court Backs FMC in Evergreen Dispute

Exmar Launches FSRU Conversion Work for Dutch LNG Terminal

Current News

CMA CGM Expands Support for Kenyan Logistics

Baltic Index Rises Alongside Rates Across Vessel Segments

Vesselindex Report Shows Fewer Listed Dry Bulk Owners Beat Market in 2025

Contship Introduces First Electric Port Tractor into Operations

Subscribe for Maritime Logistics Professional E‑News