First LNG Shipment Arrives at New Dutch Floating Terminal

Thursday, September 8, 2022

The first ship to bring a cargo of liquefied natural gas (LNG) to a new terminal at the Dutch port of Eemshaven has docked and has started the unloading process, the gas grid operator said on Thursday, part of Europe's bid to cut reliance on Russian gas.

The LNG tanker Murex berthed alongside the regasification unit at the new EemsEnergyTerminal, which can handle 8 billion cubic meters (bcm) of gas a year, a Gasunie spokesperson said.

"Everything is going perfectly," Marie-Lou Gregoire of Gasunie said.

The terminal, near Groningen, has two Floating Storage Regasification Units (FSRUs) that Gasunie leased at the request of the Dutch government.

Capacity has been booked by Shell, France's Engie SA and CEZ of the Czech Republic.

Czech Prime Minister Petr Fiala and Dutch Energy Minister Rob Jetten will declare the facility formally open at a ceremony on Thursday evening.

Gas from the terminal is expected to start entering the Dutch grid for the first time next week, although the station will not operate at full capacity until November or December.

The capacity in Eemshaven will complement the larger Gate Terminal in Rotterdam, now operating at 16 bcm capacity and which is planning a further 4 bcm expansion by 2025.


(Reuters - Reporting by Toby Sterling; Editing by Edmund Blair)

Categories: Ports LNG FSRU

Related Stories

Montrose Becomes First Port in Scotland to Provide Shore Power for Vessels

Baltimore's Alternate Shipping Channels Not Deep Enough, Maersk Says

Decarbonization is a Major Challenge for US Ports -Report

Current News

Montrose Becomes First Port in Scotland to Provide Shore Power for Vessels

Port Operator JSW Infrastructure Q4 Profit Rises 10%

The Nordic Maritime Forum 2024 will happen in Oslo

Renewable Energy System Dedicated at Port of Long Beach

Subscribe for Maritime Logistics Professional E‑News