First Ever Dual Drydocking of Aegis Destroyers

Monday, February 6, 2012
BAE Systems Ship Repair in Norfolk, VA., has performed the first ever tandem [or dual] drydocking of two U.S. Navy Aegis Guided Missile Destroyers. Both of the massive ships now rest back to back, out of the water, on one drydock.   
During a 19-hour technical and engineering feat, about 160 BAE Systems employees guided the USS Mason (DDG 87) and the USS Bulkeley (DDG 84) onto the Titan Drydock. The Titan is the largest floating drydock on the East Coast, measuring 950 feet long and 160 feet wide, with a lift capacity of 52,000 tons. Each ship is more than 500 feet long and 65 feet wide, and each weighs approximately 9,200 tons. The two destroyers are scheduled to stay on the drydock until the end of April, where they will undergo a series of routine repairs and modifications for the Navy.
Categories: Navy Ship Repair & Conversion

Related Stories

Renewable Propane Delivers Clean Energy Without the Wait

PortXchange Wins Award for EmissionInsider Port Decarbonization Platform

François Michel Appointed Chief Executive Officer of the GTT Group

Current News

Gram Car Carriers Rolls Out Orca AI Navigational Analytics Platform

Morocco’s Marsa Maroc to Acquire 45% Stake in Spain’s Boluda Maritime Terminals

Applied Acoustics Deploys Pyxis INS + USBL System for SEP Hydrographic

800-Ton Goliath Crane Takes Shape in Port of Chioggia

Subscribe for Maritime Logistics Professional E‑News