First Ever Dual Drydocking of Aegis Destroyers

Monday, February 6, 2012
BAE Systems Ship Repair in Norfolk, VA., has performed the first ever tandem [or dual] drydocking of two U.S. Navy Aegis Guided Missile Destroyers. Both of the massive ships now rest back to back, out of the water, on one drydock.   
During a 19-hour technical and engineering feat, about 160 BAE Systems employees guided the USS Mason (DDG 87) and the USS Bulkeley (DDG 84) onto the Titan Drydock. The Titan is the largest floating drydock on the East Coast, measuring 950 feet long and 160 feet wide, with a lift capacity of 52,000 tons. Each ship is more than 500 feet long and 65 feet wide, and each weighs approximately 9,200 tons. The two destroyers are scheduled to stay on the drydock until the end of April, where they will undergo a series of routine repairs and modifications for the Navy.
Categories: Navy Ship Repair & Conversion

Related Stories

CMA CGM Celebrates Maiden Call of New Port Kobe Service

Shale Oil Components Detected in Marine Fuels, says VPS

IMO Facilitation Committee Approves Digitalization Strategy

Current News

Operations Begin at Jubail Container Terminal in Saudi Arabia

Concerns Raised by Repeated Chinese Detentions of Panama-Flagged Vessels

CMA CGM Celebrates Maiden Call of New Port Kobe Service

New Wildlife Trafficking Compendium Released for Singapore

Subscribe for Maritime Logistics Professional E‑News