DFDS to Invest $1.2 Billion in Six Battery Electric Ships

MarineLink
Tuesday, May 14, 2024

DFDS said it will invest $1.2 billion in six battery electric vessels for operation in the English Channel, to be deployed on the Dunkirk-Dover and Calais-Dover routes to carry passengers and freight between the U.K. and the European Union.

The first two electric vessels will be in operation by 2030, while the rest are expected to follow before 2035, the company said.

“This is an important step towards decarbonizing cross-Channel transport," said Torben Carlsen, CEO of DFDS.

In April, DFDS said it also plans to introduce two methanol- and two ammonia- fueled vessels as part of a push to reduce emissions from its fleet.

Categories: Hybrid Drives Technology Contracts Shipbuilding Batteries Green Ports

Related Stories

Floating Titanium Lattice Could Out-Perform Steel and Plastic

Conoship Adds 40-MWh Battery-Electric Option to CIP3800 Coaster

Baltic Shipping Adds Wind-Assisted Hybrid Coasters

Current News

Argent LNG, Albania to Evaluate Development of Import Terminal

WTO: Global Goods Trade Strengthens Despite Uneasy Politics

Kuwait Petroleum Offers Oil, Refined Fuel Outside the Strait of Hormuz

Wheat Prices Rise After US Diplomatic Attempts Falter

Subscribe for Maritime Logistics Professional E‑News