GTT to Design LNG Tanks for Korean Shipyard

By Aiswarya Lakshmi
Wednesday, January 3, 2018

 GTT received at the end of 2017 an order from a South Korean shipyard regarding the design of the LNG tanks of a new LNG carrier. Its delivery is scheduled for the first quarter of 2020.

GTT will design the LNG tanks of the unit, allowing for a capacity of 174,000 m3. The insulation solution Mark III Flex has been chosen for its ability to reduce the daily guaranteed Boil-Off gas rate to 0.085% of tank volume. 48 vessels in service already benefit from this technology.
The shipowner and shipyard's names are kept confidential at this stage. 
Last month, GTT received an order from a South Korean shipyard regarding the design of the LNG tanks of 3 new LNG carriers. The deliveries are due in the first semester of 2020.
GTT will design the LNG tanks of the units, each having a capacity of 174,000 m3. The tanks will be equipped with the membrane containment system Mark III Flex, a sea-proven technology developed by GTT. This insulation system guarantees a Boil-Off Rate of 0.085%V/day. It has already been used to equip 48 vessels in service today.
Categories: Classification Societies LNG Shipbuilding Tankers Technology(Energy)

Related Stories

Alaska LNG Pipeline Study Will Be Completed This Year

Poland Eyes Bids to Expand Floating LNG Terminal

Uncertainty Mounts as U.S. Port Fees on Chinese-Built Ships Near Deadline

Current News

Port of Klaipėda Sees Growth in 2025 Q1-Q3

50 Years of Women in Navy Diving: Advancing Opportunity in Tandem with Technology

NYK Conducts Crisis-Response Drill on Car Carrier

Port of Antwerp-Bruges Sees Mixed 2025 Results Amidst VolatileTrade Conditions

Subscribe for Maritime Logistics Professional E‑News