Bouchard Orders Articulated Tug Barge from VT Halter

MarineLink.com
Wednesday, February 13, 2013

VT Halter Marine, Inc., Pascagoula, Miss., announced a new contract to build an Articulated Tug Barge (ATB) unit with an option unit for Bouchard Transportation Co., Inc. (Bouchard).


The barge will measure 625 x 91 x47 ft., has a 250,000-barrel capacity, and will be used to transport liquid petroleum. It will be ABS and USCG certified for Jones Act service.

The 10,000hp twin screw ATB tug is classed by ABS as A1 Towing Vessel, Dual Mode ATB, USCG Subchapter M, and will be equipped with an Intercon Coupler System.


Construction of the unit begins April 2013 at VT Halter Marine’s Pascagoula facility, with delivery scheduled for mid 2015. This unit will enter into Bouchard’s fleet service in New York, N.Y.


“We are pleased to enter into this contract with VT Halter Marine for the construction of the ATB M/V Bouchard Boys and B.No.270, with an option for the construction of a second unit," said Morton S. Bouchard III, President & CEO, Bouchard Transportation. "The Bouchard Boys & B.No.270 will compliment Bouchard’s growing gulf coast fleet and further our ongoing commitment to the Jones Act. Bouchard is pleased to have chosen VT Halter Marine for this project due to our long relationship and history of successful projects.”
 

Categories: Barges Contracts Shipbuilding Technology Workboats

Related Stories

Uncle Sam is Watching: Package Trackers Aim to Sniff Out Chip Smugglers

Wasaline Hits Carbon Neutrality Mark

BSM Launches Methanol Bunkering Simulator

Current News

US Container Imports Might See July Peak

Lloyd’s Register Expands Advisory Services to Meet Complexity of Ports Sector

Uncle Sam is Watching: Package Trackers Aim to Sniff Out Chip Smugglers

Baltic Index Tumbles as Big Ship Rates Fall

Subscribe for Maritime Logistics Professional E‑News