Shipbuilding News


Arctic Oil Exploration: Shell Awaits New Giant Icebreaker

Jan 17, 2012

The M/V Aiviq icebreaker, contracted by Shell Oil to support drilling in Alaska’s Chukchi Sea, is scheduled to be completed by Louisiana-based Edison Chouest Offshore in early 2012. The vessel, ordered in July 2009, is on track for April 1, 2012…

US Navy: DDG 1000's Composite Deckhouse Milestone

Jan 17, 2012

Composite materials are used to make cars, planes and boats, and have been used to build minesweepers and small surface combatants.  Now, the largest composite structure ever built—the DDG 1000 destroyer deckhouse—has been fabricated in Mississippi…

Rickmers Tianjin Named in Mumbai

Jan 17, 2012

As part of its upgrading program for its Europe India service, Rickmers-Linie, has added the 17,000dwt newbuilding Rickmers Tianjin to the schedule. The base ports served are Hamburg, Antwerp, Genoa, Mumbai and Chennai but the service is capable…

Ranger Tugs Introduces 31' Model

Jan 16, 2012

Fluid Motion, LLC, the designers and builders of Ranger Tugs have introduced the newest model in the fleet—the Ranger 31. The new R31 will debut this month at the Seattle Boat Show in the Stadium Exhibition Center, January 26-Feburary 5…

Feeding the ERP Beast: Properly Integrating CAD and ERP

Jan 14, 2012

ERP systems are beasts. To be happy, they have to be well fed. Computer Aided Design/Drafting (CAD) systems are a source of the food for Enterprise Resource Planning (ERP) systems since they contain significant information regarding the plans and materials needed to construct a ship…

BOURBON Optimizes Class Dockings for Fleet

Jan 13, 2012

BOURBON optimizes Class Dockings for its vessels with new organization Bourbon Docking.Located in Dubai, this new organization will strengthen BOURBON’s vessel maintenance program, allowing the Group to reach its 2015 target rate of 95% vessel availability…

Austal Launches Second LCS

Jan 12, 2012

Austal Launches 2nd Littoral Combat Ship CORONADO (LCS 4) Mobile, Alabama-based Austal USA successfully launched the second 127-meter Independence-Variant Littoral Combat Ship, Coronado (LCS 4). In reference to the success of the Coronado launch…

Trawlercat Introduces Anti-Piracy (PEV) Design

Jan 12, 2012

Trawlercat Marine Designs of New Westminster, British Columbia, Canada is seeking joint venture partners to join them in building their purpose-designed anti-piracy personal escort vessels (PEV).Trawlercat Marine’s president, Captain Graham…

Art Anderson Associates Names New Vice Presidents

Jan 10, 2012

Art Anderson Associates, a Bremerton-based multidisciplinary engineering services firm, has named Ralph E.  Duncan, PE as Vice-President of Marine and Sean M. Hoynes, PE as Vice-President of Facilities. Each will be responsible for customer relationship management…

Foss, State, Tribes to Build Columbia River Ferry

Jan 05, 2012

Partnership to create jobs; bring modern vessel to vital transportation link.  Foss Maritime Company is joining with Washington state and the Confederated Tribes of the Colville Reservation to build a state-of-the-art replacement for an…

Signal Announces Executive Promotions

Jan 05, 2012

Signal Internationalpromoted Michael R. Cook to Vice President of Contracts and Technical Support, Signal International and Andrew P. Veith to Vice President of Engineering, Signal International. “Our ongoing growth can be attributed to the efforts of a dedicated team of people…

AVEVA Releases AVEVA Surface Manager

Jan 05, 2012

Improve marine design quality through standards based transfer of surface to and from external systems. AVEVA, an engineering design and information management solutions for the plant, power and marine industries, has announced  the release of AVEVA Surface Manager 12…

Hyundai Heavy Develops FLNG Model

Jan 05, 2012

Hyundai Heavy Industries, the world’s biggest shipbuilder and offshore facilities contractor announced today that the Company completed developing its own Hyundai FLNG (Floating Liquefied Natural Gas Plant) model in association with Linde AG…

Keel-laying at STX Turku Shipyard

Jan 04, 2012

The keel-laying of the multipurpose deck cargo vessel, built for Oy Gaiamare Ab, was held at STX Turku Shipyard on Wednesday January 4, 2012. The NB 1379 is 105.4m long and 18.8m wide, and is scheduled to be delivered in spring 2012.  Representatives of the customer Oy Gaiamare Ab…

EBDG: Keller to Manage New Gulf Office

Jan 04, 2012

Elliott Bay Design Group LLC (EBDG) welcomes Keith Keller as its Gulf Office Manager for the firm’s New Orleans office, re-opening its doors in early 2012. Getting his start at Avondale Shipyard, Keller has over 30 years experience in shipbuilding and engineering…

Current News

Ship Design, Maritime Accidents and There’s a Master on the Run

Maersk: Effective US Tariffs Average Around 21% Currently

US Grain Shipments Surge 9% in face of Chinese Tariffs

Great Lakes Limestone Trade Up in June

Subscribe for Maritime Logistics Professional E‑News