ABB Wins $110M Order, Platform Power Link

Thursday, April 15, 2010

ABB, the leading power and automation technology group, has won an order worth $110m from Eni Norway AS, to build a power link between a new oil and gas platform in the Barents Sea and the Norwegian power grid. The order was booked in the first quarter.

The Goliat platform will be partly electrified by a 106 km subsea power cable, which can lower Goliat's carbon dioxide emissions up to 50 percent by reducing the need for electricity produced by the platform's gas turbines.

The 123kV (kilovolt) 75MW (megawatt) XLPE insulated cable is claimed to be the longest, most powerful cable ever delivered for an offshore application. It will supply AC (alternating current) power from the mainland grid in Norway to Goliat, a floating oil and gas production, storage and offloading unit.

The cable integrates fiber optics to monitor temperature and provide general communication services, and includes a 1.5 km dynamic section to accommodate the movement of the floating platform. The project is scheduled for completion by the end of 2013, when Goliat is due to begin operations.
 

Categories: People & Company News Offshore

Related Stories

ESL Joins World Shipping Council

Fincantieri, Accenture Launch JV for Cruise, Defense and Ports Digitalization

Port & Terminal Technology USA Set for Miami

Current News

DP World, Asian Terminals Inc. Invest $100M to Boost Capacity at Manila South Harbor

PD Ports Outlines Plans to Develop UK Offshore Wind Hub

DP World Begins $165 Million Expansion of Maputo Container Terminal Capacity

Port Canaveral Invests $500 Million in Five-Year Port-Wide Improvement Plan

Subscribe for Maritime Logistics Professional E‑News