ABB Wins $110M Order, Platform Power Link

Thursday, April 15, 2010

ABB, the leading power and automation technology group, has won an order worth $110m from Eni Norway AS, to build a power link between a new oil and gas platform in the Barents Sea and the Norwegian power grid. The order was booked in the first quarter.

The Goliat platform will be partly electrified by a 106 km subsea power cable, which can lower Goliat's carbon dioxide emissions up to 50 percent by reducing the need for electricity produced by the platform's gas turbines.

The 123kV (kilovolt) 75MW (megawatt) XLPE insulated cable is claimed to be the longest, most powerful cable ever delivered for an offshore application. It will supply AC (alternating current) power from the mainland grid in Norway to Goliat, a floating oil and gas production, storage and offloading unit.

The cable integrates fiber optics to monitor temperature and provide general communication services, and includes a 1.5 km dynamic section to accommodate the movement of the floating platform. The project is scheduled for completion by the end of 2013, when Goliat is due to begin operations.
 

Categories: Offshore People & Company News

Related Stories

Concerns Raised by Repeated Chinese Detentions of Panama-Flagged Vessels

NYK Bulkship Partners Sets Sail

UK Grants $85M to Develop Port Talbot Floating Wind Hub

Current News

Operations Begin at Jubail Container Terminal in Saudi Arabia

Concerns Raised by Repeated Chinese Detentions of Panama-Flagged Vessels

CMA CGM Celebrates Maiden Call of New Port Kobe Service

New Wildlife Trafficking Compendium Released for Singapore

Subscribe for Maritime Logistics Professional E‑News