Vestdavit to Equip Norwegian CG Vessels

Posted by Michelle Howard
Tuesday, September 10, 2019

Vestdavit secured an order to supply three new Norwegian Coast Guard vessels with davits equipped for polar conditions, in a project which also calls for installation of a deck-mounted transfer system for rapid deployment.

The ships are being built by Vard Group within the P6615 project to replace Nordkapp-class ships with a new generation of search-and-rescue, surveillance, and oil recovery vessels. The 136m length newbuildings have been developed for worldwide operations including arctic areas and will feature ice-strengthened hulls and ice-class notation on their delivery from Vard Langsten, Norway, one apiece in 2022, 2023 and 2024.

Each vessel will come complete with one telescopic TBD-10000L davit system plus two PLR-5003KV units, built to Vestdavit standards for minimum availability of 330 days a year up to upper Sea State 5, based on actual North Sea conditions 1958-2018. In line with the areas of operation envisaged, the davits will be winterized for full functionality in temperatures as low as -25deg C, as required in the Polar Code.

Categories: People & Company News Contracts Shipbuilding Marine Equipment Coast Guard Maritime Safety Arctic Operations SAR

Related Stories

Kruger Named President of Austal USA

Energy Transition: LNG Prices Plummet, Dual-fuel LNG Newbuilds Rise

Muddy Water Dredging Christens Marlin Class Dredge

Current News

Conflict Heating Up Over Cosco's Megaport in Peru

McDermott’s Subsidiary Grabs Marsa LNG Job Worth Up To $250M

Container Ship Deliveries Hit YTD Record

Insurance Coverage and the Key Bridge Collape

Subscribe for Maritime Logistics Professional E‑News