Underwater Thruster Repair & Maintenance Work Benefits

Press Release
Wednesday, August 15, 2012

Hydrex offer a wide range of underwater repair or maintenance work on ship thruster units.

An entire unit can be overhauled, propeller blades or seals can be replaced or repair work on a specific part of a thruster can be performed fast by Hydrex diver/technicians on site. All of these repairs can be carried out without the need to drydock the vessel.

Hydrex was the first company to show that it was possible to remove and then replace thrusters fast by creating a dry environment underwater. Using the Hydrex-developed steel mobdocks to seal off the thruster tunnel, with an access shaft protruding above the water, work teams accessed the thruster tunnel and removed or repaired the thruster within the tunnel in complete safety. This was done in conditions similar to those above water.

Hydrex has since then developed this technology further using lightweight flexible mobdocks. These modernized mobdocks, which are designed to be easily transported around the world, are used to close off the thruster tunnel on both sides. This allows divers to work in a dry environment around the unit.
 
The company has also developed a permanent thruster repair and replacement system for offshore related vessels and units. This system has been developed so it can be tailored to most vessels. It can be included in the planning for a newbuild, installed on a unit going to drydock or constructed and brought onboard at any other suitable time. With such a system on standby any repair work to the thruster that may arise can be dealt with much faster and more easily.
 
There is no need to send the vessel to drydock as all operations can be carried out in port or while the vessel is stationary at sea. Normal commercial activities can therefore continue without disruption.
 


 

Categories: People & Company News Marine Propulsion Ship Repair & Conversion

Related Stories

ESL Joins World Shipping Council

Caribe Tankers to Trial Inmarsat NexusWave Connectivity Service

AD Ports Group Releases 2024 Annual Report

Current News

DP World, Asian Terminals Inc. Invest $100M to Boost Capacity at Manila South Harbor

PD Ports Outlines Plans to Develop UK Offshore Wind Hub

DP World Begins $165 Million Expansion of Maputo Container Terminal Capacity

Port Canaveral Invests $500 Million in Five-Year Port-Wide Improvement Plan

Subscribe for Maritime Logistics Professional E‑News