TotalEnergies Restarts Port Arthur, Texas, Crude Units

By Erwin Seba
Friday, January 12, 2024

TotalEnergies on Friday restarted the large crude distillation unit (CDU) and large vacuum distillation unit (VDU) at its 238,000 barrel-per-day (bpd) Port Arthur, Texas, refinery, said people familiar with plant operations.

The refinery's two CDUs and two VDUs were shut on Thursday following a malfunction on the gasoline-producing fluidic catalytic cracker (FCC), the sources said. The CDUs and VDUs convert oil into feedstocks for all other units at the refinery.

A TotalEnergies spokesperson was not immediately available to discuss operations at the refinery.

The 76,000-bpd FCC-2 was operating on Friday, the sources said. During a malfunction on the catalytic cracker on Wednesday and Thursday, production and steam use was reduced on several units, TotalEnergies told the Texas Commission on Environmental Quality in a regulatory filing.

There is only FCC at the TotalEnergies refinery.

The 150,000-bpd ACU-1 CDU and 60,000-bpd VDU-2 restarted on Friday, the sources said. ACU-1 is one of two units operating at atmospheric pressure that begins the refining process by converting crude oil into feedstocks for all other units.

VDU-2 receives gunky residual crude oil from ACU-1 and, operating at vacuum pressure, breaks it down into feedstocks for other units.

The 40,000-bpd ACU-2, as well as the 51,000-bpd VDU-1 remained idled on Friday, the sources said.

FCC-2 has struggled to reach full production since completing a three-month overhaul on Nov. 20, sources have told Reuters.

ACU-2 and VDU-1 remained shut until mid-December as FCC-2 was raising its production level.

The FCC-2 overhaul included replacement of the 1.3-million-pound (590 metric ton) reactor on the unit.


(Reuters - Reporting by Erwin Seba; Editing by Leslie Adler and Marguerita Choy)

Categories: North America Liquid Bulk

Related Stories

AD Ports Group Releases 2024 Annual Report

Israeli Firm Gets Final Permit for US Wave Energy Demo

Crowley to Install LNG-Fueled Microgrid at Puerto Rico Terminal

Current News

PD Ports Outlines Plans to Develop UK Offshore Wind Hub

DP World Begins $165 Million Expansion of Maputo Container Terminal Capacity

Port Canaveral Invests $500 Million in Five-Year Port-Wide Improvement Plan

Syria Signs New 30-Year Deal with CMA CGM

Subscribe for Maritime Logistics Professional E‑News