Third Temporary Channel Opened in Baltimore

Sunday, April 21, 2024

The Captain of the Port (COTP) has established the Fort Carroll Temporary Alternate Channel, which is on the northeast side of the main channel in the vicinity of the Francis Scott Key Bridge and will provide limited access for commercially essential vessels.

The channel has a controlling depth of 20 feet, a 300-foot horizontal clearance, and a vertical clearance of 135 feet, and will facilitate additional commercially essential vessel traffic through the port of Baltimore.

“This additional channel increases the types of vessels able to transit inbound and outbound the port of Baltimore,” said U.S. Coast Guard Capt. David O’Connell, Captain of the Port and Federal On-Scene Coordinator, Key Bridge Response 2024. “We estimate facilitating approximately 15% of pre-collapse commercial activity.”

The Francis Scott Key Bridge collapsed into the Patapsco River in the early morning of March 26, killing six men who were working on the span at the time, after the container ship Dali lost power and crashed into a support pylon.

The Key Bridge Response 2024 Unified Command includes the U.S. Coast Guard, U.S. Army Corps of Engineers, Maryland Department of the Environment, Maryland Transportation Authority, Maryland State Police and Witt O’Brien’s representing Synergy Marine.

Categories: Ports Shipping

Related Stories

CMA CGM Vessels Navigate the Suez Canal, Hinting at Easing Tensions

Baku Port Handles 37% More Containers in 2025

Barbara Scheel Agersnap Steps Down as Copenhagen Malmö Port CEO

Current News

Port of Oakland Moves 174,239 TEUs in November as Exports Increase

CMA CGM Vessels Navigate the Suez Canal, Hinting at Easing Tensions

Oil Loading in Venezuela Crawls After New US Interceptions

FMC Investigates Spain’s Restrictive Port Practices

Subscribe for Maritime Logistics Professional E‑News