LNG Ships: Two DSME Orders for GTT

By Joseph R Fonseca
Friday, April 6, 2018

GTT announces it has received at the end of March, an order from the South Korean shipyard Daewoo Shipbuilding and Marine Engineering (DSME) for the design of the LNG tanks of two LNG carriers (LNGC).

Each offering a capacity of 173,400m3, these units will be built at DSME's shipyard in Geoje, Korea, on behalf of a European ship-owner. The tanks will be fitted with the NO96 GW technology. 
Their delivery is expected for the first half of 2020.
"We are very pleased to continue our excellent partnership with DSME with these two new orders." commented Philippe Berterottière, Chairman and CEO of GTT.
Categories: Contracts Energy LNG Naval Architecture Tankers Vessels

Related Stories

OPEC Crude Tanker Vessel Loadings Soar

Port Arthur LNG Phase 2 Receives Non-FTA Export Authorization

BAE Systems Set to Open $250M Shiplift Facility in Florida

Current News

Container Shipping Rates Plunge in Step with U.S. Demand for China Goods

World’s First Ship-to-Ship LCO₂ Transfer Completed in Shanghai

Gulf Shipping Costs Fall After Israel-Iran Ceasefire

US Goods Trade Deficit Increased in May, Exports Declined

Subscribe for Maritime Logistics Professional E‑News