LNG Ships: Two DSME Orders for GTT

By Joseph R Fonseca
Friday, April 6, 2018

GTT announces it has received at the end of March, an order from the South Korean shipyard Daewoo Shipbuilding and Marine Engineering (DSME) for the design of the LNG tanks of two LNG carriers (LNGC).

Each offering a capacity of 173,400m3, these units will be built at DSME's shipyard in Geoje, Korea, on behalf of a European ship-owner. The tanks will be fitted with the NO96 GW technology. 
Their delivery is expected for the first half of 2020.
"We are very pleased to continue our excellent partnership with DSME with these two new orders." commented Philippe Berterottière, Chairman and CEO of GTT.
Categories: Contracts Energy LNG Naval Architecture Tankers Vessels

Related Stories

Ports Could Adopt Battery Storage to Support the Next Phase of Clean Shipping

ABS, U.S. DOE to Advance Maritime Nuclear Technology

Höegh Evi, PETROS to Develop Kuching LNG Terminal in Malaysia

Current News

Japanese Giants Join Forces on Four Ammonia-Fueled Car Carriers

Seaborne Grain Exports from Russia Drop 62% in September

Shipping Through Constanta Port Stabilizes After Black Sea Attacks

Next Phase Begins on Tampa Harbor Navigation Improvement Project

Subscribe for Maritime Logistics Professional E‑News