Samsung Heavy Industries Receives AIP Certificate for Floating Data Center from ABS

Friday, May 15, 2026

ABS issued approval in principle (AIP) to Samsung Heavy Industries (SHI) for its design of a 50-megawatt floating data center.

SHI’s design utilizes a standardized shipbuilding process, integrating design, manufacturing, and equipment installation concurrently to optimize efficiency. SHI states that this approach enables shorter lead times and incorporates a proprietary power generation system, thereby minimizing reliance on onshore electricity. ABS completed design reviews based on class requirements.

“The rapidly growing capabilities of artificial intelligence present a clear opportunity to support the expanding infrastructure requirements of AI and data-intensive operations. As demand for data centers continues to increase, moving them offshore could mitigate certain risks while reducing the strain on local energy grids,” said Gareth Burton, ABS Senior Vice President, Global Engineering.

Categories: AIP Floating Data Centers

Related Stories

Cavotec Inks Southern California Shore Power Order

Fertilizer Exports Ramp Up Through Strait of Hormuz

Port Houston Records Best Monthly Container Volume Since Summer 2025

Current News

CMA CGM, Asyad Plan $400m Terminal at Sohar Port

AD Ports Group, Emirates Global Aluminium Invest $22m in Khalifa Port Infrastructure Development

BIMCO, ICS Report Warns of Possible Shortage of STCW Certified Officers

France to Export Four Barley Cargoes to China

Subscribe for Maritime Logistics Professional E‑News