Roll Group Awarded Contract for Shipment of Three Boilers

Posted by Michelle Howard
Thursday, August 16, 2018

Roll Group has been awarded a contract by Fagioli and Macchi for the transportation of three large boilers for the Gulf Coast Growth Ventures project. Presently the voyage from Porto Marghera (Italy) to Corpus Christi (USA) is scheduled to take place between August and September 2019. Each of the three boilers weigh in excess of 1000 metric tons.

The dimensions of the boilers to be transported in 2019 are all identical with a length of 30.30m, a width of 16.40m and a height of 22.70m. The modules will be rolled on board of the RollDock vessel, after smaller equipment has been lifted into the hold. After successful discharge, the boilers will be implemented in the plastics manufacturing facility of ExxonMobil and SABIC.

It is not the first time that Roll Group provides the sea transport of such heavy and large modules. Previously, the company participated in projects such as Chevron’s Gorgon Project, Novatek’s Yamal LNG and Shell’s Solvent Deasphalter (SDA).

Categories: RoRo Logistics Contracts People & Company News

Related Stories

US Crude Being Shipped to Asia Via Panama Canal

PERC Leads Fuel Conversation at Port of the Future Conference

ZIM Navigates Cooling Container Markets, Hapag-Lloyd Deal Looms

Current News

Port of Oakland: Exports Continue to Outperform Imports

Aker Solutions Wins FEED Contract for Lithuania CO₂ Terminal

Argentina Grain Exports Rise From Strong Harvest

Tanker Bound for Cuba with Fuel Cargo Diverts to Trinidad

Subscribe for Maritime Logistics Professional E‑News