HB Rentals Installation While Underway

Thursday, February 25, 2010

Accommodations specialist, HB Rentals, a Superior Energy Services company, installed a six-building accommodations package on the Siem Dorado vessel for use in the Gulf of Mexico.  In order to help the client stay on schedule, HB Rentals completed the installation while the vessel was in transit.

The package includes six ABS- and USCG-compliant twelve-man sleeper units, which will be stacked two high and three wide.  HB will also install platforms, stairways, gas detection, pressure sets, sewage treatment systems, lift pumps, transformers and distribution panels to accompany the buildings. These units will be used for six months at an estimated value of $815,000.

(www.hbrental.com)
 

Categories: People & Company News

Related Stories

Oil Supertanker Rates Drop After Record Highs

9,000 m³ Methanol-ready Tanker Christened

GT Wings Launches Lightweight AirWingS

Current News

Baltic Index Hits Third Weekly Loss As Capesize Rates Remain Weak

European Wheat Falls Alongside Shifts in the Euro, Russian Exports

Oil Supertanker Rates Drop After Record Highs

DP World Busan Deploys Electric Yard Tractors

Subscribe for Maritime Logistics Professional E‑News