OBS: Reduced Ballast Water Holding Time

Posted by Michelle Howard
Monday, March 4, 2019

Optimarin Ballast Systems (OBS) have gained approval from the United States Coast Guard (USCG) slashing their required holding time from 72 to just 24 hours for all salinities. The certification ensures the systems are optimized for short sea shipping routes in the US, as the time between ballast water treatment (BWT) and de-ballasting is cut dramatically.

USCG requires a holding time post treatment for environmentally friendly UV systems. This is to ensure all cells are inactive before testing. 

However, with increased UV doses, such as those provided by OBS’ powerful 35kW lamps, the holding time can be reduced, thus enabling greater vessel flexibility.

Categories: Ballast Water Treatment United States Coast Guard People & Company News

Related Stories

WCI Confers Leadership Awards

BV's Gregg-Smith Tapped to Head IACS

Nakilat Increases Annual Net Profit by 3.1%, Delivering $460m in FY2025

Current News

Maersk’s 2025 Report: Some Records and Some Lay Offs

Panama President: Future Port Contracts Will Not Be Issued to a Single Operator

Cuba-Related Tanker Loads Gas Cargo in Venezuela

2027 Set as Operational Start of Petronor E-Fuels Plant at Port of Bilbao

Subscribe for Maritime Logistics Professional E‑News