OBS: Reduced Ballast Water Holding Time

Posted by Michelle Howard
Monday, March 4, 2019

Optimarin Ballast Systems (OBS) have gained approval from the United States Coast Guard (USCG) slashing their required holding time from 72 to just 24 hours for all salinities. The certification ensures the systems are optimized for short sea shipping routes in the US, as the time between ballast water treatment (BWT) and de-ballasting is cut dramatically.

USCG requires a holding time post treatment for environmentally friendly UV systems. This is to ensure all cells are inactive before testing. 

However, with increased UV doses, such as those provided by OBS’ powerful 35kW lamps, the holding time can be reduced, thus enabling greater vessel flexibility.

Categories: Ballast Water Treatment United States Coast Guard People & Company News

Related Stories

ASEAN Looks to Deepen Trade Ties with China

Puerto Rico Inks LNG Contract with New Fortress Energy

Murphy Tapped To Chair Tidal Energy Company Board

Current News

ASEAN Looks to Deepen Trade Ties with China

UK’s First Electric Shipping Routes Set to Slash Irish Sea Emissions

Port of Sunderland Selects PicoMB Multibeam Technology for Port Surveys

Puerto Rico Inks LNG Contract with New Fortress Energy

Subscribe for Maritime Logistics Professional E‑News