OBS: Reduced Ballast Water Holding Time

Posted by Michelle Howard
Monday, March 4, 2019

Optimarin Ballast Systems (OBS) have gained approval from the United States Coast Guard (USCG) slashing their required holding time from 72 to just 24 hours for all salinities. The certification ensures the systems are optimized for short sea shipping routes in the US, as the time between ballast water treatment (BWT) and de-ballasting is cut dramatically.

USCG requires a holding time post treatment for environmentally friendly UV systems. This is to ensure all cells are inactive before testing. 

However, with increased UV doses, such as those provided by OBS’ powerful 35kW lamps, the holding time can be reduced, thus enabling greater vessel flexibility.

Categories: People & Company News Ballast Water Treatment United States Coast Guard

Related Stories

Rear Adm. Philip Sobeck: MSC Needs More Mariners, New Ships

New Agreement Targets Nordic Hydrogen Projects

UKHO Appoints Blake Interim Chief Executive

Current News

Saudi Red Sea Authority and NEOM Sign Tourism MoU

Matt Kaplan to Lead New Great Lakes Authority

Montrose Becomes First Port in Scotland to Provide Shore Power for Vessels

Port Operator JSW Infrastructure Q4 Profit Rises 10%

Subscribe for Maritime Logistics Professional E‑News