Ramelia Begins Maiden Voyage

Shailaja A. Lakshmi
Friday, September 20, 2019

The LNG tanker Ramelia has been delivered to the chemical tankers in Northern Europe Rederi AB Älvtank, becoming the sixth of eight vessels ordered in the Gothia Tanker Alliance series.

The vessels are built on a design where FKAB Marine design, in great cooperation with the owners Furetank, Älvtank and Thun Tankers and together with Avic Dingheng Shipbuilding Co. Ltd., have been involved from the first sketch all the way to Detail Design.

This design is an ice class 1A environmental friendly tanker, equipped with batteries and dual fuel engines for LNG operation.

It is of 16,300 DWT on design draught & 18,000 DWT on scantling draught.

The picture taken from monkey island by FKAB, with the main deck overview, was taken yesterday (September 20) on her way to Lahad Datu at Borneo, in an average wind speed of 18m/s.

Categories: LNG Vessels Tanker Shipbulding

Related Stories

Trump, Xi Pause Port Fees on Each Other's Vessels

US Grants India Sanctions Waiver to run Iranian Port

Dual Pre-FEED Wins Propel ECOnnect’s LNG IQuay Regas Terminal

Current News

Liebherr USA Appoints New Divisional Director

Port Houston Surpasses Three Million TEUs

Trump, Xi Pause Port Fees on Each Other's Vessels

US Grants India Sanctions Waiver to run Iranian Port

Subscribe for Maritime Logistics Professional E‑News