Prelude Floating LNG Facility

Friday, March 12, 2010

Shell signed two contracts with the Technip and Samsung Heavy Industries consortium for the Prelude floating liquefied natural gas (LNG) project off the coast of Western Australia. These contracts formalize the announcement made by Shell in October 2009 that Prelude is in the engineering and design phase of development.

The first contract covers the front-end engineering design (FEED) elements specific to the Prelude project, taking into account the composition of the gas, local weather conditions and other site specific factors. The second contract details the terms under which the floating LNG facility would be built, if the final investment decision for the Prelude project is made. Planning for Prelude is progressing well.

Yesterday’s signing follows a July 2009 master agreement between Shell and the Technip-Samsung consortium to work on the design, construction and installation of multiple floating LNG facilities over a period of up to 15 years. The floating design will allow Shell to place gas liquefaction facilities directly over offshore gas fields, precluding the need for long-distance pipelines and extensive onshore infrastructure. This provides a commercially attractive approach for developing offshore fields.

Categories: Offshore

Related Stories

Dual Pre-FEED Wins Propel ECOnnect’s LNG IQuay Regas Terminal

Poland Eyes Bids to Expand Floating LNG Terminal

Ulsan Port Completes Its First Green Methanol STS Bunkering for Bulk Carrier

Current News

Tanco Boosts Jeffersonville Port Capacity with $750K Fertilizer Expansion

BIO-UV Completes First Containerized Ballast Water Treatment Deployment

Capesize Values Hit 17-Year High

Maritime and Coastguard Agency Advances Marine Safety with Multiverse Data Upskilling

Subscribe for Maritime Logistics Professional E‑News