Petrobras Charter FPSO for Offshore Brazil Project

Press Release
Tuesday, November 13, 2012

Petrobras with partners BG Group and Petrogal Brasi inks charter of the FPSO from Schahin Petróleo e Gás S.A. and Modec Inc.

The Floating Production Storage & Offloading vessel (FPSO)  will be used in the production development project of the area known as Iracema Norte, in block BM-S-11, in the pre-salt of Santos Basin. The project includes the interconnection of 16 wells to the FPSO - 8 production and 8 injection wells - and production is expected to start in December 2015.

The FPSO will be deployed 300 Km off Brazil's coast, at a water depth of 2,234 meters. The platform will have a processing capacity of 150,000 bpd of oil and 8 million m3/day of natural gas. It will be operated by the companies responsible for the construction and chartered to the Consortium for a 20-year period. The schedule of the project determines the delivery of the FPSO 35 months following the signature of the Letter of Intent.

The BM-S-11 Consortium is operated by Petrobras (65%), in partnership with BG E&P do Brasil Ltda. (25%) and Petrogal Brasil S.A (10%).



 

Categories: Contracts Offshore

Related Stories

Liebherr Marks 25 years of RTGs with Enhanced Product Range

WindPort, Port Esbjerg Team Up for Norwegian Offshore Wind

Worley Secures Work on German LNG Terminal

Current News

Panama Canal Administrator Outlines the Waterway’s Evolving Role in Global Trade

Pembrokeshire College: Curriculum Development Manager Recognized for Contributions

USTR Port Fees Contrasted With Supply Growth Sound the Alarm for Car Carriers in 2026/27

Aptamus Picks Aker Solutions’ Entr for LCO2 Terminal Engineering

Subscribe for Maritime Logistics Professional E‑News