The Path to Zero: Shell Opens MW Charger in Amsterdam

Monday, June 17, 2024

Shell inaugurated on June 17, 2024, its first self-developed megawatt charger for dual use by both electric trucks and shipping vessels at the Energy Transition Campus Amsterdam (ETCA). The capacity of the megawatt charger corresponds to about three 350 kW, regular fast chargers that trucks can currently use to charge.

“In addition to our investments in biofuels and LNG, we also invest in electric mobility," said Hilmar van den Dool, General Manager eMobility at Shell. "There are not that many electric trucks and vessels yet, so with this we’re investing ahead of the market that is growing quickly. It is in line with our ambition to provide more and cleaner energy solutions.”

The megawatt charger is connected to ETCA’s own microgrid. This smart grid enables integration between energy supply, energy storage, and energy demand. The ETCA microgrid includes 3,600 rooftop solar panels, stationary battery storage, 119 EV chargers for cars1, a hydrogen electrolyzer and other research equipment.

The Megawatt Charging System (MCS) is equipped with two separate charging arms. One rotatable arm is dedicated to electric vessels, the other arm serves heavy-duty electric trucks and buses.

Categories: Ports Logistics Infrastructure Green Energy Electrification Green Ports

Related Stories

Singapore Boasts Record 2025

d’AMICO Orders Pair of Eco Design Vessels

Construction Starts on New Ammenities, Innovation Hub at London Gateway

Current News

Dardanelles Strait Traffic Resumes After Tanker Engine Failure

Urals Freight Rates to India Rise Due to Bad Weather, War Risks

Diana Shipping Plans Proxy Fight at Genco

16th Annual Maritime Risk Symposium-Student Research Poster Contest

Subscribe for Maritime Logistics Professional E‑News