Offshore Brazil: Petrobas Needs Two FPSO's

Press Release
Wednesday, March 20, 2013

Petrobras announce negotiations are under way to contract 2 Floating Production & Storage Units (FPSO's) for connection to wells in the Santos Basin.

Petrobras and its partners in Block BM-S-11, BG E&P Brasil and Petrogal Brasil, announce negotiations are under way for the contracting with consortium QGOG/SBM (Queiroz Galvão Óleo e Gás S.A./ SBM Offshore) of two FPSOs for production development at Lula Alto and Lula Central, in Lula Field, in the pre-salt cluster of Santos Basin.

 Each FPSO will be connected to 18 wells, 10 of which are production wells and 8 injectors.

Production is expected to begin in January 2016 at Lula Alto and in March 2016 at Lula Central. 



Each FPSO will have a processing capacity of 150,000 bpd of oil and 6,000,000 m3/day of natural gas.



By contract the FPSOs should be delivered no later than November 2015 for Lula Alto and January 2016 for Lula Central, allowing these areas to start production according to the schedule established in the Petrobras Business Plan. Local Content requirements in the contract are 65% for each FPSO.



With this strategy, Petrobras says it has strengthened the robustness of its oil production curve, without prejudice to local content requirements and contributing to the employment generation in the Brazilian shipbuilding industry
.

Consortium BM-S-11 is operated by Petrobras (65%), in partnership with BG E&P Brasil Ltda. (25%) and Petrogal Brasil S.A (10%).
 

 

Categories: Contracts Offshore Energy

Related Stories

Livestock Still Being Sent to War Zones

Damen Signs Contract to Deliver Combi Freighters (CF) 3850 to the Polidano Group

UK Grants $85M to Develop Port Talbot Floating Wind Hub

Current News

Kuwaiti Tanker Ablaze in Dubai Port

Titan Clean Fuels and TURN2X Agree e-Methane Supply Deal

Livestock Still Being Sent to War Zones

Ammonia, Fertilizer Trade Threatened by Strait of Hormuz Conflict

Subscribe for Maritime Logistics Professional E‑News