Miller Boat Contract to Great Lakes Group

Monday, October 5, 2009

Great Lakes Shipyard, a division of The Great Lakes Group, has been awarded a contract by Miller Boat Line, Put-in-Bay, Ohio, to fabricate and install a new 40-ft mid-body extension in the passenger/vehicle ferry Put-in-Bay.
 
The contract was awarded on August 17, 2009, and all work is underway at Great Lakes Shipyard's state-of-the-art facilities on the South Bank of the Old River Channel, on Cleveland's Cuyahoga River. The project is slated for completion by year end.
 
Miller Boat Line operates a fleet of four all-steel passenger/vehicle ferries, each approximately 96-ft in length, which run on Lake Erie from Catawba to the islands of Put-in-Bay (South Bass Island) and Middle Bass Island, Ohio.
 
The mid-body extension of the Put-in-Bay will make the vessel 136-ft overall in length and will enable it to carry up to eight additional full size automobiles or an additional 100 passengers. The project also includes the installation of new rudders, a new steering system, and a new main engine keel cooling system.
 
(www.thegreatlakesgroup.com)
(www.millerferry.com)
 

Categories: Contracts Passenger Vessels

Related Stories

Baltic Container Terminal Handles Longest, Largest Vessel to Call at Gdynia Port

DP World Completes Dredging Milestone for Senegalese Container Port

US Begins Importing Iraqi Oil Through Syria

Current News

HD Hyundai to Supply Four Port Cranes to Tacoma

Baltic Container Terminal Handles Longest, Largest Vessel to Call at Gdynia Port

DP World Completes Dredging Milestone for Senegalese Container Port

Vessel Sinks Week After Being Struck by Russian Fire

Subscribe for Maritime Logistics Professional E‑News