Miller Boat Contract to Great Lakes Group

Monday, October 5, 2009

Great Lakes Shipyard, a division of The Great Lakes Group, has been awarded a contract by Miller Boat Line, Put-in-Bay, Ohio, to fabricate and install a new 40-ft mid-body extension in the passenger/vehicle ferry Put-in-Bay.
 
The contract was awarded on August 17, 2009, and all work is underway at Great Lakes Shipyard's state-of-the-art facilities on the South Bank of the Old River Channel, on Cleveland's Cuyahoga River. The project is slated for completion by year end.
 
Miller Boat Line operates a fleet of four all-steel passenger/vehicle ferries, each approximately 96-ft in length, which run on Lake Erie from Catawba to the islands of Put-in-Bay (South Bass Island) and Middle Bass Island, Ohio.
 
The mid-body extension of the Put-in-Bay will make the vessel 136-ft overall in length and will enable it to carry up to eight additional full size automobiles or an additional 100 passengers. The project also includes the installation of new rudders, a new steering system, and a new main engine keel cooling system.
 
(www.thegreatlakesgroup.com)
(www.millerferry.com)
 

Categories: Contracts Passenger Vessels

Related Stories

Russian Oil Vessels Forced to Divert From India Under US Sanctions

British Port Association Responds to the Government's Annual Port Trade Statistics

London P&I Club Warns of Incorrect Loading of Flexible Intermediate Bulk Containers

Current News

Russian Oil Vessels Forced to Divert From India Under US Sanctions

Hanseatic Global Terminals Launches Latin America Expansion

Two CK Hutchison-Operated Ports Near Panama Could See State Partnerships Take Over

As China's Economy Slows, So Too Does Dry Bulk Shipping

Subscribe for Maritime Logistics Professional E‑News