MacGregor's Ship-to-ship compensation system Launched

By Joseph R. Fonseca
Thursday, February 23, 2017

MacGregor, part of Cargotec, has launched a new crane compensation system for offshore ship-to-ship load transfers, offering substantially larger operating windows as well as safer and faster load transfers.
 
"This robustly-tested technology can offer considerable commercial advantages to the offshore industry," says Ivar Fjermeros, Senior Sales Manager, Advanced Offshore Solutions.
 
"MacGregor understands the complexity of ship-to-ship load transfers and the limitations imposed by unpredictable, non-synchronised movements in a seaway. With the systems currently available, a crane's capacity is effectively de-rated because of the conservative approach required to minimise risks associated with the relative movements of the vessels.
 
The new compensation system employs a motion reference unit on the deck of the secondary vessel. This transmits motion data to the crane on the primary vessel via a high-speed redundant wireless link. Combining motion data from both vessels, the system calculates and applies the winch compensation necessary to minimise hook movement at the load-handling zone on the secondary vessel.
 
The system features precise tension and position control for accurate load hook-on, pick-up landing and hook-off. Safety is much improved for the deck crew working in the load-handling zone. Load pick-up and landing is precise, fast and smooth. It allows the operator to employ a less conservative approach to calculating the maximum load that can be safely handled in any given sea state.
 
"The safety benefits mark a significant improvement for offshore transfer operations," says Mr Fjermeros. "When these are combined with maximising the crane's lifting capacity, improved load transfer times and a substantial, real-world increase in weather windows for ship-to-ship operations, this system really does offer some ground-breaking benefits."
 
For owners with existing MacGregor offshore cranes wishing to benefit from this new system, it can be retrofitted cost-effectively and can be used with other MacGregor crane advances.
 

Categories: Container Ships Intermodal Logistics Offshore

Related Stories

GT Wings Establishes Manufacturing Partnership with Zunsion Technology for AirWing Production

CK Hutchison Banks 7% Profit Rise

Echo Marine Group to Deliver Western Australia’s First Electric Ferry Fleet

Current News

US Crude Being Shipped to Asia Via Panama Canal

PERC Leads Fuel Conversation at Port of the Future Conference

Exxon, BP, Vitol Ship Record Volume of US Oil Products to Australia in March

GT Wings Establishes Manufacturing Partnership with Zunsion Technology for AirWing Production

Subscribe for Maritime Logistics Professional E‑News