Italy's New FLNG Terminal to Be Operational by March 2025

Friday, July 12, 2024

Italy's gas grid group Snam SRG.MI said on Friday it expected a new liquefied natural gas (LNG) terminal to become operational by March 2025, allowing the country to diversify further its energy supplies.

The floating terminal in the Adriatic sea will have an annual regasification potential of 5 billion cubic metres (bcm), bringing Italy's total capacity to 28 bcm a year, or 45% of the country's gas demand in 2023.

The set up of the regasification unit dubbed BW Singapore, which envisages the building of both a platform offshore the costal city of Ravenna and a breakwater, is part of Italy's effort to replace Russian gas imports.

Snam said last year it would invest a total of around 1 billion euros ($1.1 billion) to buy and complete construction works for the energy infrastructure.

In a statement issued after an event in Ravenna, Snam said contracts worth around 300 million euros related to the new terminal had been awarded to local groups, with a positive effect on the regional economy.


($1 = 0.9177 euros)

(Reporting by Francesca Landini; Editing by Louise Heavens)

Categories: Ports Energy LNG Europe Natural Gas FLNG Infrastructure Liquid Bulk

Related Stories

Nord Gas to Supply LNG Regasification System for Exmar FSRU Conversion

AD Ports Group, Emirates Global Aluminium Invest $22m in Khalifa Port Infrastructure Development

NYK Group’s ICO Launches Belgium’s First Shore Power Facility for RoRo Ships

Current News

Urals Freight Rates to India Drop As Tanker Availability Increases

Maritime Technologies Forum Publishes Guidelines for Methanol as Marine Fuel

PD Ports Names New CEO

Stolt-Nielsen Limited Shares Q2, H1 2026 Results

Subscribe for Maritime Logistics Professional E‑News