Freire Shipyard Signs Deal to Build MSV for Briggs Marine

Thursday, March 9, 2023

Spain's Freire Shipyard won a contract from the Briggs Marine for the design and construction of a new Maintenance Support Vessel to support Briggs’ ongoing contracts for the inspection, servicing and replacement of navigation marks and heavy inshore moorings, operating as required with an attendant onboard diving team.  The new building, which is schedule for delivery in 2024, is 40m long with a diesel-electric DP-2 propulsion system. 

The ship will be designed to have excellent seakeeping and noise reduction features to enable 24/7 operations with a crew of 6 and accommodation for a further 10 project personnel.  The vessel is fitted with a moonpool, detachable A frame, 4-point mooring system and survey project office. In addition, a demountable Crew Transfer Vessel (CTV) boarding ladder has been incorporated into the design to support offshore windfarm projects.

Categories: Shipbuilding

Related Stories

USTR: New Measures Target Chinese Maritime Sector

Trump to Push Allies to Conform to Chinese Vessel Fee Plans

Shell Condemns Australia's LNG Plans

Current News

HD Hyundai and Maersk Cooperate on Decarbonization and Logistics

Ambrey: RSF Launched Drone Attack on Port Sudan's Container Terminal

Israel Bombs Yemen's Hodeidah Port

SAAM Terminals Holds Fourth Port Gathering to Reflect on Industry Challenges

Subscribe for Maritime Logistics Professional E‑News