Fairmount Tugs Delivers FPSO Petrojarl Knarr

By Joseph R. Fonseca
Monday, November 3, 2014

Three tugs of Fairmount Marine have towed the brand new FPSO Petrojarl Knarr from South Korea to Norway in just 61 days. Petrojarl Knarr, one of world’s largest floating production and storage units (FPSO) for harsh environments, was delivered in the port of Haugesund, Norway, September 16th 2014.

The entire voyage was under command of lead tug master Kees de Graaff on board of the leading tug Fairmount Sherpa. The newly delivered FPSO Petrojarl Knarr is 256.4 meters long and 48 meters wide with a dwt of 135,000 tons. The vessel is owned by Teekay Corporation and is build by Samsung Heavy Industries in Geoje, South Korea. Petrojarl Knarr will be deployed later in the Knarr oil and gas field offshore Norway.

On her way to Norway the convoy has made stops in Singapore, Port Louis (Mauritius) and Las Palmas (Canary Islands) to take bunkers and for replenishments. For the last leg of the voyage the convoy sailed west of Ireland via Fair Isle (just south of the Shetland Isles) towards Norway.

Offshore the port of Haugesund the Petrojarl Knarr was delivered ahead of schedule.

Categories: Arctic Operations Contracts Logistics Marine Equipment Marine Materials Offshore Vessels

Related Stories

In the Heat of the Summer, Cool Carriers Receives Snow Flake

Ukrainian Drone Attack Hits St Petersburg Oil Terminal

Boskalis, Van Oord to Expand Swedish Port with $570M Dredging Job

Current News

Russian Grain Lobby Warns Black Sea Attacks Threaten Grain Security

France Selects Five Ports for $300M Floating Wind Investment

July Russian Oil Exports From Western Ports Fall Amidst Black Sea Attacks

Travis Niederhauser Appointed Company President at Phoenix

Subscribe for Maritime Logistics Professional E‑News