Coronado (LCS 4) Keel Laying

Tuesday, December 22, 2009

Austal hosted an abbreviated U.S. Navy keel-laying ceremony for its second Littoral Combat Ship, Coronado (LCS 4).

Fabrication has started on twelve of the twenty-eight modules that will make up this 416.6 ft trimaran design. Six of the twenty-eight modules are currently being outfitted with ships equipment such as gas turbines, generators, and propulsion equipment, and electrical, piping and ventilation systems. Three modules have been erected in their pre-launch position.
 

Categories: Shipbuilding

Related Stories

Applied Acoustics Deploys Pyxis INS + USBL System for SEP Hydrographic

800-Ton Goliath Crane Takes Shape in Port of Chioggia

Class NK GDA for World First Vessel Tank Tech

Current News

Morocco’s Marsa Maroc to Acquire 45% Stake in Spain’s Boluda Maritime Terminals

Applied Acoustics Deploys Pyxis INS + USBL System for SEP Hydrographic

800-Ton Goliath Crane Takes Shape in Port of Chioggia

Renewable Propane Delivers Clean Energy Without the Wait

Subscribe for Maritime Logistics Professional E‑News