Coronado (LCS 4) Keel Laying

Tuesday, December 22, 2009

Austal hosted an abbreviated U.S. Navy keel-laying ceremony for its second Littoral Combat Ship, Coronado (LCS 4).

Fabrication has started on twelve of the twenty-eight modules that will make up this 416.6 ft trimaran design. Six of the twenty-eight modules are currently being outfitted with ships equipment such as gas turbines, generators, and propulsion equipment, and electrical, piping and ventilation systems. Three modules have been erected in their pre-launch position.
 

Categories: Shipbuilding

Related Stories

Partnership Aims to Advance Bio-LNG as Marine Fuel

OMS Group Celebrates Keel-Laying of CS Resilience

Reefer Ships: Resilient Link in the Cold Chain

Current News

Richard Crowther Named HDR Maritime Director for Europe, Middle East

LD Armateurs Installs Six Rotor Sails on Airbus RoRo Carrier

High Shipping Rates Pressures Asian Oil Refiners Dependent on Middle Eastern Crude

JPMorganChase Announces New Leadership for $1.5 Trillion Security and Resiliency Initiative

Subscribe for Maritime Logistics Professional E‑News