Coronado (LCS 4) Keel Laying

Tuesday, December 22, 2009

Austal hosted an abbreviated U.S. Navy keel-laying ceremony for its second Littoral Combat Ship, Coronado (LCS 4).

Fabrication has started on twelve of the twenty-eight modules that will make up this 416.6 ft trimaran design. Six of the twenty-eight modules are currently being outfitted with ships equipment such as gas turbines, generators, and propulsion equipment, and electrical, piping and ventilation systems. Three modules have been erected in their pre-launch position.
 

Categories: Shipbuilding

Related Stories

Russian Attack Hits Port Infrastructure

US Naval Blockade Hammers Iran Oil Exports, Forces Floating Storage

BIMCO Adopts Time Charter Party to Target Emerging CO2 Trade

Current News

Mercuria Sues Baltic Exchange Over Freight Losses from Hormuz Closure

Ukrainian Drones Hit Tuapse Port Again, Environmental Crisis Deepens

Russian Attack Hits Port Infrastructure

Port Snared in US-China Dispute, says Panama President

Subscribe for Maritime Logistics Professional E‑News