Two 'Combi Freighter' Contracts for Alewijnse

Posted by Michelle Howard
Thursday, December 12, 2019

Alewijnse Marine has won the contract for the electrical fit-out of two additional Damen Combi Freighter 3850s currently in build at Damen Yichang Shipyard for delivery in January 2020.

The contract is based around the design, build and delivery of the main and emergency switchboards that form the core of the vessels’ electrical systems including those for alarm monitoring, fire alarms and public address. Alewijnse personnel will also oversee the installation and commissioning of the systems undertaken by the yard’s technicians.

Damen’s Combi-Freighter range is comprised of eco-friendly, sea-going, multi-purpose cargo vessels that combine high capacity with low operating costs. Available with a wide range of standardized options they can be adapted for almost any role. The 3850 is 90 meters in length and has a DWT of 3,800 tonnes.



Categories: People & Company News Contracts Shipbuilding Ship Design Bulk Carriers Intermodal

Related Stories

Shipping Full Steam Ahead: What '25 has set up for '26

LNG Bunker Vessel Christened

Low-Emission Cement Carrying Vessel to be Dual-Fuel Methanol

Current News

International Flag-State Association Looks to Advancing Role in Policymaking

The Northwest Seaport Alliance Retires Two Legacy Cranes from Terminal 7

Barbara Scheel Agersnap Steps Down as Copenhagen Malmö Port CEO

MSC: How the World’s Largest Boxship Fleet Squeezes More Miles from Every Molecule

Subscribe for Maritime Logistics Professional E‑News