Closed Portion of Houston Ship Channel Opens

Tuesday, September 29, 2009

The three mile portion of the 52-mile Houston Ship Channel that was closed due to an oil spill Sept. 25 opened at 12:45 p.m. Sept. 28 to vessel traffic.

 The channel, which was closed between Old Manchester Dock Three and City Dock 27, is open to all daylight operations and limited night time barge operations.

The Coast Guard Vessel Traffic Service is managing all vessel movement.

The Captain of the Port, Capt. Marcus Woodring, determined the oil is contained along the shoreline, making it safe to resume traffic flow through the affected area at a slow speed.

Responders will continue to work to recover the remaining oil in the area. The exact amount of oil recovered is unknown, but as of 2 p.m. 23,418 gallons of an oil and water mixture has been recovered.

Categories: Casualties

Related Stories

ScioSense Launches UFC23 Ultrasonic Flow Converter for High-Precision, Ultra-Low-Power Smart Metering

NexusWave Implemented on IEA Fishing Vessels

Awake.Al, Tidalis Collaborate for Maritime Emissions Reporting

Current News

ScioSense Launches UFC23 Ultrasonic Flow Converter for High-Precision, Ultra-Low-Power Smart Metering

Samsung Heavy Industries Receives AIP Certificate for Floating Data Center from ABS

US Import Costs Rise in April, Fuel Sees Biggest Gain in Four Years

NexusWave Implemented on IEA Fishing Vessels

Subscribe for Maritime Logistics Professional E‑News