China Shipyard Lays Keel for BAM Crane Barge

Press Release
Tuesday, February 5, 2013

Damen partner Nantong Yahua Shipyards celebrate laying down the keel of BAM International's new crane barge.

Scheduled for delivery in April 2013, the 80m long Damen CBa 8025 barge is to be provided with day accommodation and will be named ‘IB 429’.

Currently Damen is building several barges on order and for keeping in stock, which can lead to fast delivery times.



Categories: Barges Shipbuilding

Related Stories

Oil Slips as Oman Reports Normal Operations at Key Oil Terminal

Future Workforce: Maritime and Supply Chain Graduate Finley Navigates Success

174K LNG Vessel Christened; Board Approves New 8-Ship Contruction Plan

Current News

Panama Canal Reduces Maximum Vessel Draft for Neopanamax Locks

Maritime Drone Self-Detonates in Constanta Port

Oil Slips as Oman Reports Normal Operations at Key Oil Terminal

SEA-LNG: LNG Bunkering is Surging

Subscribe for Maritime Logistics Professional E‑News