Cavotec Wins Port Power Supply Deal for Malta’s Valletta Grand Harbor

MarineLink
Monday, May 17, 2021

Cavotec won a contract by Nidec ASI as part of its $14.5 million deal to provide ShorePower to five cruise liner berths at Malta’s Valletta Grand Harbor. The project is part of a major EU funded initiative by Infrastructure Malta to electrify the entire harbor and reduce portside ship emissions by 90%.

Cavotec's ShorePower solution has been designed to meet the specific requirements of the Valletta Port and connect vessels over their entire port length. It includes the mobile cable management system, PowerMove, to provide ship-to-shore connectivity. The PowerMove units are connected to the island’s energy infrastructure to power vessels while in port.

Four of the PowerMove units are designed to travel 45m along a vessel’s berth, from the shore socket box to the vessel connection point. The fifth will extend a record length, spanning more than 55m, to meet the specific requirements of the Deep Water Quay.

A remote-controlled telescopic arm adjusts to match the tide changes and the location of the power connections on cruise ships. The PowerMove units can provide power to cruise vessels independently of their electrical requirement: 6.6 KV or 11Kv, in 50Hz or 60Hz. In doing so, the units meet the variety of cruise ship configurations that utilise the port facilities.

Categories: Technology Ports Cold Ironing Greenhouse Gas Emissions

Related Stories

Furetank VINGA Series Tanker to be Named

Hackathon Spotlights AI, Autonomous Systems for Maritime Security

Ammonia-Fueled Vessel Delivered to EXMAR

Current News

Iran's Strait Authority to Facilitate Passage Through Hormuz

AD Ports Group Launches Joint Venture Noatum ‎Ports – Maqta Ayla Digital Solutions

DNV Verifies Lifting System for Immersed Tunnel

AD Ports Group Enhances Al Faya Dry Port’s Integration with the Global Trade and Logistics Ecosystem

Subscribe for Maritime Logistics Professional E‑News