Aker Solutions Contracted for UK Subsea Field Redevelopment

Press Release
Wednesday, March 13, 2013

Aker Solutions secures a NOK 650 million (GBP 70 million) contract with BP to help redevelop one of the largest oil fields in the UK sector.

The Aberdeen operation of Aker Solutions will manufacture and supply all subsea controls equipment for the Quad 204 project, the redevelopment of the Schiehallion and Loyal fields located approximately 100 miles west of the Shetland Islands.

The scope of work includes subsea controls equipment for subsea trees, manifolds and subsea safety isolation valves as well as controls distribution assemblies.

The Schiehallion and Loyal fields are estimated to contain a further 450 million barrels of recoverable oil and a GBP 3 billion upgrade is underway. Due to the water depth in the area, Schiehallion is entirely reliant on subsea production technology and is collected on a floating production, storage and offloading vessel (FPSO).

Alan Brunnen, head of Aker Solutions' subsea business said: "West of Shetland is an exciting area for oil and gas and we are delighted to continue our successful relationship with BP by playing such a significant role in the continuing development of this project."

The deliverables will be managed, designed and built by Aker Solutions' subsea controls centre of excellence in Aberdeen with the first deliveries made in the first half of 2014.
 

Categories: Contracts Offshore Energy Underwater Engineering

Related Stories

Trump, Xi Pause Port Fees on Each Other's Vessels

US Grants India Sanctions Waiver to run Iranian Port

Unifeeder, Sagarmala Finance Corporation Limited to Advance Sustainable Coastal Shipping in India

Current News

Millions of Cigarettes Seized in Multi-Nation Operation

Liebherr USA Appoints New Divisional Director

Port Houston Surpasses Three Million TEUs

Trump, Xi Pause Port Fees on Each Other's Vessels

Subscribe for Maritime Logistics Professional E‑News