Aker Solutions Contracted for UK Subsea Field Redevelopment

Press Release
Wednesday, March 13, 2013

Aker Solutions secures a NOK 650 million (GBP 70 million) contract with BP to help redevelop one of the largest oil fields in the UK sector.

The Aberdeen operation of Aker Solutions will manufacture and supply all subsea controls equipment for the Quad 204 project, the redevelopment of the Schiehallion and Loyal fields located approximately 100 miles west of the Shetland Islands.

The scope of work includes subsea controls equipment for subsea trees, manifolds and subsea safety isolation valves as well as controls distribution assemblies.

The Schiehallion and Loyal fields are estimated to contain a further 450 million barrels of recoverable oil and a GBP 3 billion upgrade is underway. Due to the water depth in the area, Schiehallion is entirely reliant on subsea production technology and is collected on a floating production, storage and offloading vessel (FPSO).

Alan Brunnen, head of Aker Solutions' subsea business said: "West of Shetland is an exciting area for oil and gas and we are delighted to continue our successful relationship with BP by playing such a significant role in the continuing development of this project."

The deliverables will be managed, designed and built by Aker Solutions' subsea controls centre of excellence in Aberdeen with the first deliveries made in the first half of 2014.
 

Categories: Contracts Offshore Energy Underwater Engineering

Related Stories

TotalEnergies, OQEP Start Construction of Marsa LNG Plant in Oman

Charting the Evolving U.S Offshore Wind Landscape

Worley Secures Work on German LNG Terminal

Current News

DP World, Asian Terminals Inc. Invest $100M to Boost Capacity at Manila South Harbor

PD Ports Outlines Plans to Develop UK Offshore Wind Hub

DP World Begins $165 Million Expansion of Maputo Container Terminal Capacity

Port Canaveral Invests $500 Million in Five-Year Port-Wide Improvement Plan

Subscribe for Maritime Logistics Professional E‑News