Posted to Maritime Musings
(by
Dennis Bryant)
on
December 2, 2014
The bark HMS Endeavour was built in 1764 as the collier Earl of Pembroke. A type known locally as a Whitby Cat, it had a broad, flat bow, a square stern, a long box-like body with a deep hold, and a flat bottom. Originally ship-rigged, it was…
Posted to Maritime Musings
(by
Dennis Bryant)
on
August 14, 2012
The albatross is the largest of all birds in terms of wingspan (up to 12 feet). It can be found soaring above all ocean waters of the Southern Hemisphere and above the North Pacific. It is largely absent from the North Atlantic, probably due to loss of habitat.
Posted to Move to give STCW a slant on learning
(by
Joseph Fonseca)
on
September 6, 2010
With near misses and accidents on the rise while at sea, the focus has with intensity come to rest on training and STCW conventions. A lot of soul searching and introspection is taking place with a section of trainers coming to the conclusion…
Posted to Global Maritime Analysis with Joseph Keefe
(by
Joseph Keefe)
on
September 1, 2010
Responding directly to our August 10th article entitled, “STCW Compliance: will we or won’t we,” the U.S. Coast Guard’s Director of National and International Standards has affirmed the U.S. position on STCW compliance, especially as it relates…
Posted to Irano Hind may weather US/EU ban
(by
Joseph Fonseca)
on
August 2, 2010
The sanctions imposed by the US and the European Union on Iran because of its nuclear ambitions are likely to see the Islamic Republic of Iran Shipping Lines and a number of entities with which it is associated becoming prime targets. For Irano…
Posted to SCI takes delivery of its first LR-I size Product Tanker
(by
Joseph Fonseca)
on
July 26, 2010
State owned Shipping Corporation of India Ltd. (SCI) took delivery of a Long Range-I (LR-I) Product Tanker, M.T. Swarna Sindhu, on 23rd July, 2010 raising the number of tankers in its fleet to 41 and the company’s total fleet strength to 74 vessels. M.T.
Posted to Brazilian Subsea and Maritime News
(by
Claudio Paschoa)
on
June 16, 2010
Large-scale seabed processing facilities will require a subsea power grid system that is able to operate for long step-outs with total reliability withstanding extreme pressure and temperatures. As technology leader on land-based power grids…