28719 members and growing – the largest networking group in the maritime industry!

LoginJoin

Tuesday, December 10, 2019

Blogs

Tags

One Small Step for the TWIC Program?

Posted to Maritime Transportation Security News and Views (by John C.W. Bennett) on September 30, 2010

Last week the Transportation Security Administration (TSA) updated its list of TWIC Readers that have successfully completed the Initial Capability Evaluation (ICE) to include an additional hand-held reader. This brings the total of portable…

Subsea Power Grid to Enable Large-Scale Subsea Processing

Posted to Brazilian Subsea and Maritime News (by Claudio Paschoa) on June 16, 2010

Large-scale seabed processing facilities will require a subsea power grid system that is able to operate for long step-outs with total reliability withstanding extreme pressure and temperatures. As technology leader on land-based power grids…

St. Lawrence Seaway

Posted to Maritime Musings (by Dennis Bryant) on May 14, 2010

The St. Lawrence Seaway is a system of locks, canals, and channels providing a connection for ocean-going ships between the St. Lawrence River and Lake Ontario. Small vessels had historically traveled this route, although portage was often required around rapids…