ONE DRIVER AT A TIME

Multiple, separate, and parallel lines of responsibility and communication do not facilitate successful project management.

  The other day I was talking to a friend who is a marine industry PE. Not surprisingly, he took me to task about my last blog post, “Who Should Be the Designated Driver?” He pointed out that it is all well and good to say that, in a perfect world, a project schedule should drive engineering, and not the other way around. But, he went on, there are situations in which in-house engineering deliverables are delayed by factors beyond the control of in-house engineering.

      For example, situations in which critical information and drawings from an outside vendor are delayed or simply non-existent. If the build-client has hired the outside vendor, that vendor is neither under the control of, nor necessarily responsive to pressure from the yard’s in-house engineering. In such cases, my friend points out, in-house engineering is forced to work through the build-client or the client’s representative with, as often as not, little positive effect. The result is that the project manager gets his shorts in an uproar, yard execs with bottom line responsibilities get cranky, and the build-client becomes increasingly unhappy with progress -- while all parties misdirect their displeasure at in-house engineering.

 
     My friend is right. It ain’t always under his control. And simply throwing in-house engineering under the bus may shift the focus of displeasure temporarily, but it will not do anything to correct schedule slippage and associated problems. Unless such situations are corrected timely or, better yet, avoided at the very inception of a project, the results are likely to be not only production delays, but as well late project completion, monetary losses for both build-client and shipyard and, perhaps most unfortunate, hard feelings all around. So, what to do?

 
     First, avoid project structures which have multiple and parallel lines of responsibility and control. If production depends day-to-day on in-house engineering, and if some or all of in-house engineering’s work depends on timely action and responses from outside vendors, than make sure that outside vendors are contracted by the yard, with direct responsibility to the yard, and not by the build-client. When an outside vendor is contracted by the yard, that vendor much more likely to be responsive to the needs of the yard’s in-house engineering department. The watchword here is no responsibility without authority.

 
     Second, if a build-client, for whatever reason, insists on directly contracting with outside vendors, then the yard needs to insist on the build-client having its own project manager, who is charged with full responsibility for maintaining a timely flow of deliverables from outside vendors. This arrangement has to be bolstered by penalties to the build-client (now, that’s a novel idea) for production delays and cost overruns due to tardy deliverables from outside vendors contracted directly by the build-client. And this all needs to be spelled out and quantified in contractual form at the start of a project.

 
     Third, if a project already started does not conform to one or the other of the above scenarios, and is running into schedule problems due to late deliverables from outside vendors, yard management has to bite the customer-relations bullet (some will no doubt argue that it is more like a customer-relations cyanide capsule) and renegotiate the contractual situation to bring it into conformity with one or the other of the above two scenarios.

 
     Eliminating multiple, separate, and parallel lines of responsibility and communication does not, as some might believe, facilitate project success. It works against it. So choose your project management structure very carefully.  Because experience always matters...
 
 
Posted by Phil Friedman on 1/26/2010 9:37:05 PM
Report abuse



Bookmark this page to:Add to Faves Add to MyAOL Add to Simpy Add to Delicious Add to Live Add to Digg Add to Newsvine Add to Reddit Add to Multiply Add to Blogmarks Add to Yahoo MyWeb Add to Slashdot Add to Mister Wong Add to Spurl Add to Furl Add to Link-a-Gogo Add to Yahoo Bookmarks Add to Twitter Add to Facebook Add to Diigo Add to Mixx Add to Segnalo Add to StumbleUpon Add to Magnolia Add to Ask Add to Backflip Add to Terchnorati Add to Google Bookmarks Add to MySpace

Comments
Blog post currently doesn't have any comments.

Sign in

Latest blog comments

7/30/2010

Dennis Bryant
Richard, I too believe that laws providing for retroactive...

7/29/2010

Ron Oyer
Properly monitored, e-learning will make training more affo...

7/28/2010

Vural ONUR
Very much interesting and informative. Thank you.

7/27/2010

Animesh Nagpaul
THIS IS A BIGGEST ACHIEVEMENT BY SCI. STILL 1 OIL TANKER LE...

7/22/2010

Jon Watson
When first introduced a great many complex and sometimes se...

7/16/2010

Richard Wells
Dennis - First I agree with you that too much legislation i...

7/16/2010

Greg Knowler
Gary You are right that the PSS has nothing to do with equ...

7/15/2010

Raina Clark
Creativity and resourcefulness - requirements for a towboat...

7/15/2010

Robert Blakeney
Good initial description of the Coriolis effect, Dennis. It...

7/15/2010

Gary Ferrulli
Greg That's one way to look at it. The other may be more c...
 
© 2009 New Wave Media     Terms
Any Questions: support@maritimeprofessional.com